← Blog

· keywords, schedule, settings

Keywords and an empty main query in the schedule

The README states that keywords must be added manually after install, and that the main schedule query may be empty—in that case only enabled keywords are used.

Why teams use this

Many projects prefer a set of phrases instead of duplicating a “main query” everywhere.

Verify

After edits, check collection runs and collection logs for applied parameters.